Long-Lead Mini Fuse Bypass Switch
-
1-5 DAYS FREE DELIVERY*
-
100% ORIGINAL AND QUALITY
-
12 MONTHS GUARANTEE
Additional Attributes:
- GTIN: 00612314584451
- Finish - XA: BLACK RUBBER
- Item Class - XA: CME
- Rate Class - XA: 65.0
- Shipping Weight - XA: 0.170
- Retail Height - XA: 2.000
- Box Height in Inches - XA: 0
- Retail Width - XA: 4.000
- Parcel Allowed - XA: Yes
- Item Width - XA: 0.000
- Box Width in Inches - XA: 0
- Class ID: 11
- Box Length in Inches - XA: 0
- Tariff 301 - XA: No
- Product Weight - XA: 0.000
- Warranty: One-Year Limited Warranty
- Item Height - XA: 0.000
- Item Length - XA: 0.000
- Retail Length - XA: 9.000
Extened Information:
- Emissions : Emission verification to be determined in ACES, vehicle application data.
- Life Cycle Status: Available To Order
Packaging:
- Quantity of Each: 1
- Package UOM: EA
- Dimension: 9.000 x 4.000 x 2.000 inches
Additional Attributes:
- GTIN: 00612314584451
- Finish - XA: BLACK RUBBER
- Item Class - XA: CME
- Rate Class - XA: 65.0
- Shipping Weight - XA: 0.170
- Retail Height - XA: 2.000
- Box Height in Inches - XA: 0
- Retail Width - XA: 4.000
- Parcel Allowed - XA: Yes
- Item Width - XA: 0.000
- Box Width in Inches - XA: 0
- Class ID: 11
- Box Length in Inches - XA: 0
- Tariff 301 - XA: No
- Product Weight - XA: 0.000
- Warranty: One-Year Limited Warranty
- Item Height - XA: 0.000
- Item Length - XA: 0.000
- Retail Length - XA: 9.000
Extened Information:
- Emissions : Emission verification to be determined in ACES, vehicle application data.
- Life Cycle Status: Available To Order
Packaging:
- Quantity of Each: 1
- Package UOM: EA
- Dimension: 9.000 x 4.000 x 2.000 inches
SHIPPING & DELIVERY
FAST & FREE SHIPPING
We offer free shipping within Canada from our warehouses located across different states for easy and on-time delivery. We offer fast and free shipping on almost all our products. Some products require special handling for which additional fees may apply.
Please note we do not ship to APO/FPO/ PO BOX addresses.
SAME DAY SHIPPING
For product in stock, the orders placed before 2 pm EST are processed the same day for shipping. All custom orders, and out of stock items, do not qualify for same-day shipping. Free shipping not cover in Yukon Territory, Northwest Territory, Nunavut, Hawaii, Alaska, Puerto Rico, U.S. Territories, and International Shipping - please contact our support representative for additional details.
DELIVERY TIME
Most orders are shipped and delivered within 2 – 3 days. Delivery may vary for remote locations and during holiday session.
FREIGHT SHIPPING
Some items require special handling and do not qualify under the free shipping offer. Products that are oversized, large, and heavy require special handling and cannot be shipped using regular delivery methods. We offer the best shipping rates for products that do not qualify under free shipping. After placing an order if the product requires additional shipping charges, one of our sales team members will contact you before the product is shipped. You may cancel your order if you do not wish to pay the additional shipping charge and request a full refund.
DELIVERY INSPECTIONS
Upon order delivery, we ask that you inspect the orders for:
- If any visible damage is present, inspect your shipment prior to accepting delivery.
- In most cases, deliveries arrive in perfect condition. However, if you notice any damage to the packaging or product, refuse the shipment and take photos of the damage. Refuse the shipment and call us immediately.
Â
FREE SHIPPING EXCEPTION LOCATION
- -Â Â Â Â Â Â Â Â Â Yukon Territory
- -Â Â Â Â Â Â Â Â Â Northwest Territory
- -Â Â Â Â Â Â Â Â Â Nunavut
- -Â Â Â Â Â Â Â Â Â Alaska
- -Â Â Â Â Â Â Â Â Â Hawaii
- -Â Â Â Â Â Â Â Â Â Puerto Rico
- -Â Â Â Â Â Â Â Â Â other U.S. Territories